How to use this worksheet

Print the table below or copy it into a spreadsheet, with one column per bid. Go through each estimate and fill in what it says for every line. Where a bid is silent, write "not stated" rather than assuming. The gaps are often more revealing than the totals.

Pay particular attention to whether each bid includes rebuilding. Some contractors stop once materials are removed and the structure is dry, leaving drywall, insulation, paint and flooring for someone else. Others include rebuild. Two bids that look far apart may simply cover different halves of the project.

Line-by-line comparison

Line item
Moisture source
What to look for
Named cause and who corrects it
Follow-up if missing
Who fixes the leak, and when?
Line item
Affected area
What to look for
Rooms, walls and approximate square footage
Follow-up if missing
Can you mark the areas on a floor plan?
Line item
Containment
What to look for
Barriers, sealed vents, negative air, number of air scrubbers
Follow-up if missing
How will the rest of the house be protected?
Line item
Materials removed
What to look for
Drywall height, insulation, carpet, pad, trim, cabinets
Follow-up if missing
What happens if growth extends further?
Line item
Materials cleaned in place
What to look for
Framing, sheathing, concrete, ductwork
Follow-up if missing
How will cleaning be done and verified?
Line item
Pre-work testing
What to look for
Asbestos or lead sampling for older materials
Follow-up if missing
Is testing included or separate?
Line item
Drying
What to look for
Equipment, duration estimate, moisture targets
Follow-up if missing
What reading counts as dry?
Line item
Disposal
What to look for
Bagging, hauling and any special handling
Follow-up if missing
Is disposal included?
Line item
Clearance
What to look for
Visual inspection, independent testing, or both
Follow-up if missing
Who pays if clearance fails?
Line item
Rebuild
What to look for
Drywall, insulation, paint, flooring, trim
Follow-up if missing
Is this a separate estimate or contractor?
Line item
Permits
What to look for
Any Denver permits for plumbing, electrical or structural work
Follow-up if missing
Who pulls and closes permits?

Fill one column per bid. Use the right-hand column to note follow-up questions.

Interpreting big differences

  • IfOne bid removes far more drywall than the otherAsk each contractor to explain how they mapped the affected area, and whether moisture readings support their line.
  • IfOne bid has no containmentAsk why. Very small, isolated areas may not need full containment, but anything inside living space generally does.
  • IfOne bid relies mostly on spraying or foggingAsk where physical removal of growth fits; coatings are not a substitute for removal.
  • IfOnly one bid mentions testing older materialsFor a pre-1980 Hilltop house, treat that as a point in its favor and ask the other contractor about it.

Before you pick a bid

  • Every bid describes the same rooms and walls, or the differences are explained
  • The moisture source fix is assigned and scheduled
  • Change-order rules are written down for hidden damage
  • Payment schedule is tied to completed stages, not front-loaded
  • You understand who handles rebuild and permits
  • Proof of insurance is on file